G0–G1 SEED POTATO SUPPLYVARIETY SELECTION · QUALITY CONTROL · CONTROLLED STORAGEQUALITY SYSTEM ↗
JunshengSeed potatoes & plantlets
Home/News/2027 Spring Seed Potato Tenders: Six Checks from Notice to Delivery

News & insights

2027 Spring Seed Potato Tenders: Six Checks from Notice to Delivery

Six checks for the first spring season after China’s revised virus-free seed potato codes took effect, from tender specifications to lot records and delivery changes.

Tagged seed potato sacks on pallets in a seed store

Start by checking the stage of the procurement. A procurement intent indicates a preliminary plan. The issued tender and its attachments set the bidding conditions, specification and delivery period. Check the latest amendments before committing an inventory lot or transport slot. An award notice answers a separate question about the outcome.

Spring 2027 is the first spring planting season after China’s two revised virus-free seed potato codes took effect. GB/T 29378-2026 covers production and GB/T 29377-2026 covers grading and inspection. Both were issued on 30 April 2026 and took effect on 1 November 2026, replacing their respective 2012 editions. Check the cited edition, the full grade name and the supporting lot records before drafting an offer. Production code · Grading and inspection code · 21 November guide to the new codes

Six tender checks from the purchasing specification to contract changes
Checks arranged in tender and delivery order.

1. Read the specification, delivery period and amendments

Check any clarifications or corrections first. Then record the project number, buyer, lots, varieties, grades, units, receiving locations and the date from which the delivery period runs. Where a contract counts days from signature, use that date to work back through inspection, packing and transport. For deliveries split by location, record quantity and the receiving contact for each site. Read the item schedule carefully if the tender includes goods other than seed potatoes.

2. Match grade and variety to the standard cited

GB/T 29377-2026 identifies G1 (原原种), G2 (原种) and G3 (大田种薯) as its three grades. G0 is used in some industry or supplier propagation schemes, so ask the supplier what material it refers to. For a bid or contract under GB/T 29377-2026, record the standard number and the full grade designation consistently in the quote, inspection records and label proof. If a tender calls for 一级种, check the definition and standard named in the tender. GB 18133-2012 also remains in force. GB 18133-2012

3. Link every inspection report to the shipment lot

Identify the tests covered, sampling date and issuer, then connect the sample ID to the lot to be shipped. If packaging lots have yet to be assigned, state when the shipment-to-report mapping and final documents will be ready, and who will review them.

Blank seed potato inspection index beside a package label specimen
Blank specimen showing the fields that connect inspection records and package labels.

4. Approve the label before dispatch

Put the variety, grade, pack size, declared weight or count, package lot and applicable movement documentation on a delivery checklist. If two trucks draw from one inspected lot but carry different packaging lots, record the identifiers and counts by truck and show how both link to the inspection report.

5. Agree on receiving inspection and exceptions

Specify sampling, checks, review deadlines and who completes the receiving record. If physical damage is observed, record the lot and package position before following the agreed sampling and review procedure. Attach the receiving sheet and label example where useful. Seed potato receiving inspection

6. Decide how a delay, lot change or substitution is handled

Agree on notice, written approvals, price treatment and whether unaffected lots may be accepted separately. For example, if two locations are scheduled to receive the same day but only one can take an early replacement truck, put the priority location and revised window in writing. Follow the tender terms for any proposed variety substitution.

Suppliers can prepare an index of eligibility documents, lot evidence, label proofs and the delivery plan.

To check proposed lots, send the variety, grade, quantity and delivery locations. Use the dispatch plan for lots that need to move before the holiday. Contact form · Spring Festival dispatch plan

EXPLORE MORE

From information to a supply discussion

Comments & technical questions

Discuss this article. New comments are reviewed before publication. For quotations or private specifications, use the contact page.

No approved comments yet. You can start the discussion.