G0–G1 SEED POTATO SUPPLYVARIETY SELECTION · QUALITY CONTROL · CONTROLLED STORAGEQUALITY SYSTEM ↗
JunshengSeed potatoes & plantlets
Home/Minitubers & seed potatoes

PRODUCTS & PROPAGATION

Minitubers & seed potatoes

Connect greenhouse propagation with further multiplication through clear variety, generation, batch and delivery requirements.

Explore the product & process ↓
Minitubers & seed potatoes
JUNSHENG · PRODUCTION PHOTOGRAPH

Choose the propagation stage first

Minitubers and seed potatoes for further multiplication serve different stages of a growing plan. Start with the intended next crop, then compare variety, batch identity, grade and quantity. Tuber size alone does not establish a seed generation.

Minitubers

Connect plantlet production with further multiplication. Confirm source, lot, count, size or weight range, dormancy and sprout condition.

Seed potatoes for multiplication

Confirm generation, the applicable grading scheme, health documentation, size range and delivery window.

A connected production sequence

01Plantlet cultivation02Greenhouse propagation03Minituber harvest04Batch grading05Further multiplication

Keep source identity connected through the stages. A finished tuber’s appearance cannot replace propagation and batch records.

Agree the delivery specification

ItemWhat to agree
Variety & purposeGrowing region and intended next crop.
GenerationGrading scheme and propagation records; a G0 or G1 label alone does not establish equivalence.
Quantity & sizeCount or weight basis, size range and pack unit.
Health & conditionTested targets, batch documents, damage, dormancy and sprout condition.
TimingPlanting date, transit duration and storage on arrival.

Check the lot on arrival

Match labels, variety, quantity and size to the order. Record the lot, inspection time and photographs when checking damage, rot or sprouts. Separate suspect material and discuss it before mixing lots.

Explore seed storage & delivery →

Prepare your supply enquiry

Share the growing region, variety, propagation stage, quantity, planting date and delivery destination. Confirm the final grade, specification and acceptance criteria in the order.

EXPLORE MORE

From information to a supply discussion